Belleau Labs
Back to contracts

Fast Rising B-Plug (FRBP) Service Life Extension Program (SLEP)

AFWERX · AFWERX TACFI · AFWERX

AI-Readiness Score
14/25
Pathway Speed
4/5
Timeline Realism
3/5
Problem Framing
4/5
AI / ML Fit
0/5
Award + Transition
3/5

Award

$1,520,339
Award ceiling
MARK G. MILLER, INC
Awardee
Posted May 11, 2023

Description

The Intercontinental Ballistic Missile (ICBM) Minuteman III (MMIII) weapon system represents a critical component of the U.S. Strategic Nuclear Triad. This system must remain operational at all times to support the speed and reach of ICBMs (including new/future ICBM technologies). The Fast Rising B-Plug (FRBP) system installed at MMIII Launch Facilities (LF)s is experiencing significant reliability issues and component failures, with diminishing availability of replacement parts. This TACFI effort will expand the currently contracted Phase III SBIR Energy Storage System Replacement (ESSR) for the FRBP Service Life Extension Program (SLEP), ultimately ensuring that all reliability, maintainability, and safety issues are addressed within the MMIII weapon system. The Energy Storage System (ESS) is used to supply power to the Motor Drive Cabinet (MDC) during FRBP operation, which provides access control to the MMIII LF Personnel Access Shaft (PAS). Select Engineering Services (SES) has designed and demonstrated a prototype ESS utilizing ultracapacitors and high-energy discharge to power the FRBP during both normal and emergency operations. This unique application of ultracapacitors will replace the existing mechanical flywheel ESS, substantially increasing reliability and system readiness. Further refinements to the ESS and control system will also be evaluated as a part of this effort.

Score Rationale

The AI/ML fit score is a hard zero — this is a hardware SLEP for a nuclear launch facility power system (ultracapacitor energy storage replacing a flywheel), with no AI component whatsoever; 'AI' is not even mentioned, and the problem is not AI-shaped by any stretch. On the positive side, the pathway is legitimate AFWERX TACFI (fast-track, non-FAR), the problem is well-bounded with a named incumbent (SES), a clear artifact (ESS), and a defined end-user system (MMIII LF), earning a reasonable problem framing score; however, the $1.52M ceiling and vague transition language keep award/transition at a 3.

Source

View original posting
Back to all contracts